As we continue to spin up gas flux measurements, CSAT3s will be installed as needed.
Currently, CSAT3 S/N 2678 has been reinstalled in the LEO east bay as of 12/12/2023.
As we continue to spin up gas flux measurements, CSAT3s will be installed as needed.
Currently, CSAT3 S/N 2678 has been reinstalled in the LEO east bay as of 12/12/2023.
Posted by Wei-Ren Ng · Categories: LEO · Permalink