Blog - Data-logging and Controls - posts for July 2016

LEO SDI-12 system powered on for cooling experiment

The SDI-12 systems in all three bays were powered on to support an air flow / cooling experiment. VWC is required for the surface heat flux computation.

LEO Sampling Interval Change

July 24, 2016
The sampling interval for most LEO sensors, excluding 5TM, MPS-2, and CS451, has been set to 1 minute for a series of above slope air flow experiments. Since there is no anticipated irrigation I have decided to leave the SDI-12 sensors (listed above) at the standard 15 minute logging interval.

Tags:
  
This wiki is licensed under a Creative Commons 2.0 license
XWiki Enterprise 13.10.5 - Documentation