Blog - posts for February 2025

LEO Irrigation issues

On 2/11/2025, it was found that a rubber coupler with the irrigation line for the West bay pump (needs to be verified) had a leak. The associated irrigation pump was isolated and two pumps were used for the rain the same day.

Additionally, there was a failure with the controls computer network card that caused the rain to continue beyond 2:30pm. The rain was only turned off around 3:45pm.

No overland flow was observed.

Tags:
Created by Michael Sibayan on 2022/05/03 16:48
  
This wiki is licensed under a Creative Commons 2.0 license
XWiki Enterprise 13.10.5 - Documentation