LEO center 5TM MPS2 sensor array was found offline from 1/27/2020 1900 hours. The sensor array was brough back online at 2/21/2024 1400 hours.
The power supply to the sensor array had failed and the fuse on the AC power side to it was blown.
Note that it was a 0.5A fuse and was upgraded to a 1.5A fuse. The other bays, West and East will have their fuses similarly upgraded as well as this sensor array continue to require more power as they continue to deteriorate beyond their life expectancy.