Archive
Last modified by Administrator on 2022/05/11 13:16
Blog - posts for July 2016
Jul 25, 2016,
LEO SDI-12 system powered on for cooling experiment
The SDI-12 systems in all three bays were powered on to support an air flow / cooling experiment. VWC is required for the surface heat flux computation.
Jul 24, 2016,
LEO Sampling Interval Change
July 24, 2016
The sampling interval for most LEO sensors, excluding 5TM, MPS-2, and CS451, has been set to 1 minute for a series of above slope air flow experiments. Since there is no anticipated irrigation I have decided to leave the SDI-12 sensors (listed above) at the standard 15 minute logging interval.