Blog - posts for July 2019

LEO CSAT3

There is no LEO CSAT3 for the East or West bay installed due to damage/maintenance.

Data logging to the East and West bay have been stopped as of 7/25/2019 8:25am.

LEO Center Load 14_-3_0 cells 3130 channel swap

load cell 14_-3_0 signal channel was swapped to see if the noise was less prevalent in the other channel.

Tags:
  
This wiki is licensed under a Creative Commons 2.0 license
XWiki Enterprise 13.10.5 - Documentation