Instrumentation panel damage - West P03
At approximately 9:30 on Nov. 21 an instrumentation panel (West-P03) was damaged along with a few sensor cables. Repairs underway.
PE102-075 flow meter added to Center Bay Leak collector
Added a Seametrics PE102-075 flow meter inline with the Leak tipping bucket in the Center Bay.
Valid flow rates for this model are 0.2 - 20 GPM.
Data for Leak tipping bucket between 11/15/2016 11:40 - 13:06 are not valid
20161110100054 XWiki.eahunt
Vacuum started at 0930 on all samplers for all three hill slopes. Vacuum stopped at 0630 next morning. Collected all sample available as Set 1 for geochemistry.
LEO bigPERTH experiment started
The LEO bigPERTH experiment was started on Nov. 6, 2016 at 23:00 MST.
Irrigation actuators on LEO East and West did not respond, so circuits were opened and closed in manual mode with a slight start-time delay (1-5 minutes).
Irrigation valve actuator swap 2016117093157
On Nov. 6, 2016 from about 10:45 PM - 11:30 PM Aaron and Michael performed work on the electric actuators controlling/monitoring LEO irrigation.
Several of the actuators were not responding (No diagnostics have been performed), so we swapped around actuators such that each bay now should have a functional actuator on both the MULTI1 and MULTI2 circuit.
Due to this change several irrigation circuits will display as "in transition" because they have been physically removed / electrically disconnected.