Blog - LEO - posts for November 2016

Instrumentation panel damage - West P03

At approximately 9:30 on Nov. 21 an instrumentation panel (West-P03) was damaged along with a few sensor cables. Repairs underway.

PE102-075 flow meter added to Center Bay Leak collector

Added a Seametrics PE102-075 flow meter inline with the Leak tipping bucket in the Center Bay. 

Valid flow rates for this model are 0.2 - 20 GPM. 

Data for Leak tipping bucket between 11/15/2016 11:40 - 13:06 are not valid

Seepage clogged

Seepage clogged and fixed,flow rates down while fixing

20161110100054 XWiki.eahunt

Vacuum started at 0930 on all samplers for all three hill slopes.  Vacuum stopped at 0630 next morning.  Collected all sample available as Set 1 for geochemistry.

LEO bigPERTH experiment started

The LEO bigPERTH experiment was started on Nov. 6, 2016 at 23:00 MST.

Irrigation actuators on LEO East and West did not respond, so circuits were opened and closed in manual mode with a slight start-time delay (1-5 minutes).

Irrigation valve actuator swap 2016117093157

On Nov. 6, 2016 from about 10:45 PM - 11:30 PM Aaron and Michael performed work on the electric actuators controlling/monitoring LEO irrigation. 

Several of the actuators were not responding (No diagnostics have been performed), so we swapped around actuators such that each bay now should have a functional actuator on both the MULTI1 and MULTI2 circuit. 

Due to this change several irrigation circuits will display as "in transition" because they have been physically removed / electrically disconnected.