Blog - LEO - posts for May 2024

West bay DVI7911 replacement

DVI7911 anemometers were replaced ahead of gas flux measurements in the LEO West bay.

The following were replaced:

  1. 10,-2 (levels 1 and 4 replaced) 4/10
  2. 24,0,1 (Level 1) 4/18
  3. 17,0,4 (level 5) 4/19
  4. Two anemometers were replaced on 10,2 mast, however, need to verify which two were replaced.

Tags:
  
This wiki is licensed under a Creative Commons 2.0 license
XWiki Enterprise 13.10.5 - Documentation