Blog - LEO - posts for July 2015

LEO-E_4_0_1_HMP60 replaced

July 28, 2015 - Nate replaced the damaged HMP60 by cutting the old cable connector and splicing a new one. Data appears to be valid.

East bay CSAT3 RS422 transceiver installed

3 masts were raised (4,0) (10,-2) (10,2) at approximately 10:30 on 7/23 and were kept up until approximately 13:30 order to allow for the installation and testing of an RS422 transceiver inside the CSAT3 control box.

West bay CSAT3 RS422 transceiver installed

3 masts were raised (4,0) (10,-2) (10,2) at approximately 7:30 on 7/22 and were kept up until approximately 12:00 order to allow for the installation and testing of an RS422 transceiver inside the CSAT3 control box.

Center bay CSAT3 RS422 transceiver installed

3 masts were raised (4,0) (10,-2) (10,2) at approximately 12:00 on 7/9 and were kept up until approximately 12:00 on 7/10 in order to allow for the installation and testing of an RS422 transceiver inside the CSAT3 control box.

Tags:
Created by Michael Sibayan on 2022/05/03 16:48
  
This wiki is licensed under a Creative Commons 2.0 license
XWiki Enterprise 13.10.5 - Documentation