Archive
Blog - LEO - posts for July 2015
LEO-E_4_0_1_HMP60 replaced
July 28, 2015 - Nate replaced the damaged HMP60 by cutting the old cable connector and splicing a new one. Data appears to be valid.
East bay CSAT3 RS422 transceiver installed
3 masts were raised (4,0) (10,-2) (10,2) at approximately 10:30 on 7/23 and were kept up until approximately 13:30 order to allow for the installation and testing of an RS422 transceiver inside the CSAT3 control box.
West bay CSAT3 RS422 transceiver installed
3 masts were raised (4,0) (10,-2) (10,2) at approximately 7:30 on 7/22 and were kept up until approximately 12:00 order to allow for the installation and testing of an RS422 transceiver inside the CSAT3 control box.
Center bay CSAT3 RS422 transceiver installed
3 masts were raised (4,0) (10,-2) (10,2) at approximately 12:00 on 7/9 and were kept up until approximately 12:00 on 7/10 in order to allow for the installation and testing of an RS422 transceiver inside the CSAT3 control box.