Archive
Last modified by Michael Sibayan on 2022/05/03 16:48
Blog - LEO - posts for 2015
January (1)
February (6)
- LEO-E Camera track system installation
- LEO-C_0_0_0_EX81 registering phantom flow
- LEO Flow meter rewiring
- LEO-E irrigation valve manifold rebuild
- LEO-E_4_0_1_HMP60 damaged
- 81 mm irrigation on LEO-W and LEO-C on 2015-02-12
April (1)
May (4)
- Tipping bucket maintenanced
- Tipping buckets maintenanced
- Attempted repair of seepage basin leak
- Leaking ports sealed
June (3)
July (4)
- Center bay CSAT3 RS422 transceiver installed
- West bay CSAT3 RS422 transceiver installed
- East bay CSAT3 RS422 transceiver installed
- LEO-E_4_0_1_HMP60 replaced