Second coring conducted on 12/21/2016.
Modifications included:
1. Battery-operated drill head (coring happened faster because of this)
2. Coring locations were 1 (26.75,0), 2 (17.75, 0), 3 (9.75, 0), 4 (3.75, 0), 5 (9.75, 3), 6 (9.75, -3)
3. Cores recovered were shorter in length as compared to first coring event on November 8th. The depth of the soil core in the hillslope was however 85 cm. So either the soil is compacted or getting displaced.
4. All cores were divided into 5 equal sub-parts.
5. Katerina has information on volumteric dry weight for this set of cores.